Project Information
DeLotto was selected as Construction Manager to construct this Hoffman Architects designed Performing Arts Center.
DeLotto worked with Shorecrest Preparatory School to complete a multi-million redevelopment and construction program which dramatically changed the look and function of the campus. Six uniquely challenging projects were completed under Construction Management and Design Build methods of project delivery. The Raymond Arts and Media Center was designed to support Shorecrest Preparatory School’s strong and diverse Arts and Humanities programs that includes a comprehensive Fine Arts Enrichment Program introducing all students to accomplished artists, various music forms and theatrical performances, both on and off campus.
The 31,482 square foot facility includes a Performing Arts wing which includes a 610 seat theater with state-of-the-art lighting and sound, black box theater, instrumental/choral music suite, multipurpose room, dressing rooms/costume storage, shop/prop storage, art gallery, box office and donor lobby. The Media Center wing includes a central circulation desk, upper/middle school reading stacks, lower school reading stacks with a storytelling area, instructional areas, conference rooms, and computer workstations (study carrels). This challenging project was completed under the Construction Management method of project delivery.